Global Data Center Platform
Discover. Analyze. Understand Impact.
The most comprehensive interactive platform for data center discovery — covering existing, planned, and under-construction facilities worldwide.
6,156
Facilities tracked
60.40 GW
Tracked capacity (950 of 6,156 facilities)
53.19 GW disclosed (116) · 7.21 GW AI-estimated (834)
169
Countries
141
Planned & under construction
All Facilities (6156)
Sorted by power capacity| Name | Location | Power | Status |
|---|---|---|---|
| Hyperion | LA, United States | 5000 MWHyperscale-class | active |
| PORTS-Pike Technology Campus | Pike County, Ohio, United States | 4250 MWHyperscale-class | planned |
| Baltic Data Center Campus | Lublewo, Poland | 3200 MWHyperscale-class | planned |
| Project Camellia | GA, United States | 3200 MWHyperscale-class | planned |
| Project Tembo | Cheyenne, Wyoming, United States | 2700 MWHyperscale-class | planned |
| Project Phoenix | Shippingport, Pennsylvania, United States | 2000 MWHyperscale-class | construction |
| Paducah American Energy Hub | Kevil, KY, United States | 1800 MWHyperscale-class | planned |
| Pecos Data Center | Pecos, Texas, United States | 1500 MWHyperscale-class | planned |
| Devon Data Campus | Alverdiscott, Devon, United Kingdom | 1500 MWHyperscale-class | planned |
| Campus IA | Fouju, Île-de-France, France | 1400 MWHyperscale-class | planned |
| West Creek Business Park | VA, United States | 1200 MWHyperscale-class | planned |
| QTS Project Wind (Cambois Data Centre Campus) | Cambois, England, United Kingdom | 1100 MWHyperscale-class | planned |
| Louisa County campus | Virginia, United States | 1100 MWHyperscale-class | planned |
| Polaris Forge 2 | Harwood, ND, United States | 1000 MWHyperscale-class | construction |
| Meridien Renewable Energy Hub and Data Centre | Western Australia, Australia | 1000 MWHyperscale-class | planned |
| Muskie Data Campus | KY, United States | 1000 MWHyperscale-class | planned |
| Chapelcross data centre campus | Chapelcross, Scotland, United Kingdom | 1000 MWHyperscale-class | planned |
| Childress AI Data Center Campus | Childress, Texas, United States | 1000 MWHyperscale-class | planned |
| Project Ares | Northern Territory, Australia | 1000 MWHyperscale-class | planned |
| Pantheon Atlas Topusko Data Center | Topusko, Croatia | 1000 MWHyperscale-class | planned |
| Meta's 1 GW Alberta Campus | Sturgeon County, Alberta, Canada | 1000 MWHyperscale-class | planned |
| Port Washington campus | Port Washington, WI, United States | 902 MWHyperscale-class | construction |
| Tuckahoe Technology Park | VA, United States | 900 MWHyperscale-class | planned |
| Gryfin Project | Słupsk and Redzikowo, Pomeranian Voivodeship, Poland | 790 MWHyperscale-class | construction |
| Project Atlas | South Whitehall Township, Pennsylvania, United States | 725 MWHyperscale-class | planned |
| AI Gigafactory | Rotterdam, Netherlands | 600 MWHyperscale-class | planned |
| Cato data centre | Fife, United Kingdom | 600 MWHyperscale-class | planned |
| Cato data center | Auchtertool, Fife, United Kingdom | 600 MWHyperscale-class | planned |
| Pure Data Centres Group | Seinäjoki, Finland | 550 MWHyperscale-class | planned |
| Applied Digital Delta Forge 1 | Boyce, LA, United States | 430 MWHyperscale-class | construction |
| Microsoft Rome campus (Huffaker Road) | Rome, GA, United States | 422 MWHyperscale-class | planned |
| Justified Data campus | Hawesville, Kentucky, United States | 401 MWHyperscale-class | construction |
| Chiba Project | Chiba, Chiba, Japan | 400 MWHyperscale-class | planned |
| Al-Risha Sovereign AI & Digital Infrastructure Campus | Jordan | 400 MWHyperscale-class | planned |
| SYD3 | Huntingwood, New South Wales, Australia | 400 MWHyperscale-class | planned |
| MBL1 | Moorabool, Australia | 400 MWHyperscale-class | planned |
| Google Data Center Fredericia | Denmark | 385.617 MW est.Hyperscale-class | active |
| Imperial Valley Computer Manufacturing data center complex | CA, United States | 330 MWHyperscale-class | planned |
| DC MALPICA AI project | Mora, Castilla-La Mancha, Spain | 300 MWHyperscale-class | planned |
| Circle T Data Center | Westlake, Texas, United States | 300 MWHyperscale-class | planned |
| Nostrum Evergreen Data Center | Badajoz, Extremadura, Spain | 300 MWHyperscale-class | planned |
| Crusoe Load 2 | Texas, United States | 260 MWHyperscale-class | planned |
| Dallas Market Center | Dallas, Texas, United States | 245 MWHyperscale-class | planned |
| Taloja campus | Navi Mumbai, India | 240 MWHyperscale-class | planned |
| Krolmap Data Center Campus | Belchite, Zaragoza, Spain | 225 MWHyperscale-class | planned |
| Digital Realty IAD (43881 Devin Shafron) | Ashburn, VA, United States | 214.795 MW est.Hyperscale-class | active |
| Delta Forge 2 | Brookwood, AL, United States | 210 MWHyperscale-class | planned |
| Ennis data centre | Ennis, Ireland | 200 MWHyperscale-class | planned |
| Project Lola | Council Bluffs, IA, United States | 200 MWHyperscale-class | construction |
| CDC Maddington Campus | Maddington, WA, Australia | 200 MWHyperscale-class | planned |
Frequently Asked Questions
What is a data center?
A data center is a purpose-built facility that houses servers, storage, and networking equipment used to run applications, host websites, and store data at scale. Modern facilities range from small edge sites to hyperscale campuses drawing hundreds of megawatts of power.
What does Data Center List track for each facility?
For every facility we track location (city, state/region, country), operator, operational status (active, planned, or under construction), and power capacity in megawatts where disclosed or reasonably estimable — all shown on the interactive map and in the crawlable facility list on this page.
How is data center power capacity measured?
Capacity is expressed in megawatts (MW) of IT power — the electrical load available to run servers and cooling, distinct from a facility's physical square footage. We label figures as disclosed (from public/operator sources) or AI-estimated when no public figure exists, and we never blend the two without stating the split.
What is the difference between planned, under-construction, and active facilities?
"Active" facilities are operational today. "Under construction" facilities are physically being built. "Planned" facilities have been announced or permitted but have not yet broken ground. All three statuses are shown on the map and in the facility table so you can see the full pipeline, not just what's live.
Is the facility data on this site free to use?
Yes — the directory, map, and rankings on Data Center List are free and publicly accessible. We source and estimate data to keep it as accurate and current as possible, and clearly note when a figure is estimated rather than disclosed.